Kitabı oku: «The Waterways of the Pacific Northwest», sayfa 3
In 1850 a wooden tramroad was built on the north side and later another on the south side around the cascades of the Columbia. Late in the 50's the Oregon Steam Navigation Company gained control of them and installed a steam railroad on the north side.
About 1860 that company began the construction of a railroad from The Dalles to Celilo, which commenced operations in 1862, during a period of intense mining activity in Idaho, Eastern Oregon and Northern Washington. Thereafter it practically owned the Columbia above the Cascades. The history of its operations and exactions and of the colossal fortunes it piled up for its stockholders reads like fiction.
The first actual improvement of a waterway that I remember was at Oregon City. In 1860, at the west side of the Willamette River, the local transportation company constructed basins above and below the falls, so that a long warehouse covered both landing places, making it a comparatively easy matter to transfer freight up and down, while passengers walked. About 1870, the company replaced this system by a short canal with locks.
For a great many years the United States has made liberal appropriations to be used in overcoming the difficulties of navigation of the Columbia River and its main tributaries. Under date of August 6, 1915, Major Arthur Williams, United States Engineer of the First Oregon district, furnished the following list of original expenditures:
Snake River, in Oregon, Washington and Idaho, including $85,000 appropriated by the state of Washington, $338,786.43; Columbia River and tributaries above Celilo Falls to the mouth of Snake River, Oregon and Washington, including $25,000 from the state of Washington, $494,600.84; Columbia River at The Dalles, Oregon and Washington (Dalles-Celilo Canal), $4,685,855.79; canal at the Cascades of the Columbia River, Oregon and Washington, $3,912,473.33; Columbia River between Vancouver, Washington, and the mouth of the Willamette River, $97,532.16; Oregon Slough (North Portland Harbor), Oregon, $34,437.60. In addition to the foregoing $390,921.58 have been expended in operation and maintenance.
In a letter of recent date from Chas. L. Potter, Lieutenant Colonel, Corps of United States Engineers, are tabulated the amounts heretofore expended in the second district on all river and harbor improvements to June 30, 1915, as follows:
Willamette River above Portland, and Yamhill River, Oregon, $857,671.92; operating and care of lock and dam in Yamhill River, Oregon, $43,426.95; Willamette River at Willamette Falls, Oregon, $83,441.71; operating and care of canal and locks in Willamette River, near Oregon City, Oregon, $344.22; Columbia and Lower Willamette rivers below Portland, Oregon, $3,577,958.35; mouth of Columbia River, Oregon and Washington, $13,156,162.52; Clatskanie River, Oregon, $18,867.34; Cowlitz River, Washington, $102,208.63; Lewis River, Washington, $39,587.19; Cowlitz and Lewis rivers, Washington, and Clatskanie River, Oregon, dredge and snagboat, $36,138.04; Grays River, Washington, $3,857.23.
Had this opening up to navigation been completed prior to the building of the railroads along the banks of the rivers and across the mountains, it would have been of inestimable benefit to the tributary country, but until its present population shall have increased ten fold, perhaps twenty fold, and the railroads shall be unable to handle the traffic; when the waterway craft shall be aids to the railroads, not competitors, I believe transportation of freight by steamboats or by barges with tugs will be impracticable. Steamboat service up the swift current with little cargo will fully offset any cheapening that may be possible down stream, so that most of the business will continue to be done by the railroads. However, the open river will undoubtedly be a check upon the railroads.