A few weeks ago, at Lewiston, during the rejoicings over the opening of the upper Columbia to free navigation, one of the leading speakers remarked that the party in steaming up the river had seen but one other boat and she was tied to the dock.

The state of Washington was in some measure benefited jointly with Oregon by the work in the Columbia basin noted above. The actual expenditures by the United States in Washington have been small in comparison. On Willapa Harbor they have been $241,878.39; at Gray's Harbor, $3,231,906.78; on Puget Sound they have been, at Olympia, $197,701.35; at Tacoma, $324,784.10; at Everett and Snohomish, $664,752.59; at Bellingham, $149,834.69; Skagit River, $101,455.54; Swinomish, $217,652.29. In addition to the work done at Tacoma by the United States, the railroads and the municipality have spent large sums in providing docks and other shipping facilities, and it is equipped to handle its full share of the Sound and seagoing traffic. The foregoing figures were furnished me from the office of the resident United States Engineer, Major J. B. Cavanaugh.

Portland is the overshadowing city of the Columbia basin, and has always handled most of its business, while on Puget Sound trade and commerce have been divided. It is all a vast harbor and its cities have had access almost equally to the sea. Seattle, Tacoma, Vancouver, Victoria, New Westminster, Everett, Bellingham, Anacortes, Olympia, and Port Townsend are credited with an aggregate of nearly three-quarters of a million of inhabitants.

During the last ten years there has been expended in Seattle more than fifteen millions of dollars in harbor improvements. By the operations of the Seattle & Lake Washington Waterway Co. there have been 1400 acres of land filled, much of it now covered with buildings of a most substantial character. When this company began operations these lands were covered twice a day from six to sixteen feet with tidal water. Through them it dug waterways forty and fifty feet deep at low tide two and one half miles long, 1000 feet wide, and two miles additional five hundred feet wide. This has required the construction of seven miles of bulkheads, all at a cost of a little more than five millions of dollars, all paid by the owners of the filled-in lands. Some four hundred additional acres of land, at times covered by the tides or by high waters of the Duwamish River, have been reclaimed.

A ship canal between the waters of Puget Sound and Lake Union and Washington is now nearing completion and is expected to be in use during the current year. It will admit the passage of ships drawing thirty feet of water, directly into the lakes.

The locks at the outer entrance have been constructed by the United States government. The larger is 850 feet long and is the second in size on the American continent, being exceeded in size by one of the locks of the Panama Canal. They cost $2,275,000. The state of Washington, county of King and city of Seattle contributed $1,250,000 to pay for condemnation of the necessary land and dredging and digging of the canals. Add to this $6,000,000, raised by the sale of longtime bonds voted by the people and expended by the Port Commission of Seattle for docks and warehouses, refrigerator plants and other facilities for speedy and economical handling of cargoes of grain, fruit, fish, lumber, coal, etc., and the above aggregate of $15,000,000 has been passed.

John W. B. Blackman, Esq., City Engineer of New Westminster, B.C., has supplied information regarding Victoria, Vancouver, and New Westminster, British Columbia, as follows: Expenditures in Fraser River in opening, deepening, straightening, etc., $1,399,645.05; in Vancouver, mostly in widening the Narrows, $2,174,148.45; at Victoria in recent years, $750,000 in round numbers, has been spent in blasting and removing rock from the inner harbor, and a new break-water is now being constructed at an estimated cost of $3,000,000.

Yaş sınırı:
12+
Litres'teki yayın tarihi:
30 haziran 2017
Hacim:
13 s. 1 illüstrasyon
Telif hakkı:
Public Domain
Metin
Ortalama puan 0, 0 oylamaya göre
Metin
Ortalama puan 0, 0 oylamaya göre